@HunEndorfin: I was at first wondering what charge I should take (20% was with Hephaistos Corp, for those that had the Bonus Package of X3AP). I chose 50% charge, because all station parts are constructed without further interaction and, when using the "cheaty" version, all wares neede will be supplied as well. I'll see if I lower it for the next update (I think 25-30% are indeed reasonable as well), but I have some things to fix before I do that (I found that a station may not be constructed properly as of now, when I connected a cv to a built station, the station was partly rebuilt...). for now, if you want stuff cheaper, there are two positions that need modifying:
- ui/p_order_station_overview.lua: line ~47, totalcost = totalcost * 1.5 <- change 1.5 to 1.3 for 30% charge or 1.25 for 25% charge
- md/pstationbuildservice.xml: line ~76, <set_value name="$stationcost" exact="($stations.{$i}.$resourceneed.$totalcost)Cr * 1.5" /> <- again change 1.5 to whatever wanted